APL logo - link to homepage
About APL  News  Contact Us  Help  
NavigationNavigation  
APL History
Narrative
Explore
Innovate
Prosper
Timeline
1846-1899
1900-1959
1960-Present
Vessel History
Site Map

History - President Cleveland (Second)

Cleveland

Built 1947 by Bethlehem Shipbuilding Co., Alameda California. Hull No. 9509. O/N 254,296

LOA=609'5 3/4" LBP=573'0" B=75'6" D=43'6" Draft=30'2"
Displacement=23,504 LT Deadweight=10,431 LT Gross tonnage=15,329
Cargo capacity=193,584 CuFt. Passengers=379 first class + 200 economy Speed=20 knots

Machinery: Twin screw, turbo electric drive, 20,000 HP. Four CE WT boilers, 625 PSI WP.

Laid down as the Navy transport ADMIRAL D.W. TAYLOR but redesigned for APL passenger service long before launching. Launched as President Cleveland. Sold to Oceanic Cruise Development, Inc. (C.Y. Tung group) February 9, 1973 and renamed ORIENTAL PRESIDENT. Scrapped at Kaohsiung, Taiwan in 1974.

Glossary of Terms



Part of the NOL Group - link  to Web site