APL logo - link to homepage
About APL  News  Contact Us  Help  
NavigationNavigation  
News
Press Releases
Media Contacts
Features
Customer Advisories
Customer Updates
Awards

APL celebrates opening of Global Gateway Central – answer to port productivity challenge

Two-year project completed, Oakland container handling capacity doubles; city should benefit

Oakland, May 20, 2008 – APL, a leading global container shipping line, today celebrated completion of two-years of reconstruction at its Oakland, California, marine terminal, doubling cargo-handling capacity without expanding its footprint.

The project has also improved terminal operating efficiency, permitting future cargo volume growth in Oakland while minimizing environmental consequences.

The milestone achievements will be recognized this evening with a reception for 500 employees, customers and maritime industry partners at the Port of Oakland that will include Oakland Mayor Ron Dellums. As part of the ceremony, the terminal will be renamed Global Gateway Central.

“We’ve talked for years about the need to improve productivity at U.S. ports,” said John Bowe, President of the Americas for the company. “By completing this project we’ve significantly increased our cargo-handling capacity and we’ve done it without adding a single acre of space in Oakland. That’s a dramatic productivity gain.”

The $68 million renovation, jointly funded by APL and the Port of Oakland, is the outgrowth of a long-term lease extension signed by the carrier in 2006. It’s expected to have significant impact for the port and the city of Oakland.

For example, by adding capacity, APL said additional shipping services can now be routed into Oakland. That would mean additional jobs for the city. APL currently employs 500 people in Oakland.

Reconstruction of Global Gateway Central, which took place without ever shutting down operations, increases terminal efficiency by:

  • Leveling the property to eliminate a three-foot grade separation that had existed since APL first joined two parcels of land to create its terminal in 1976;
  • Eliminating abandoned buildings and reclaiming the vacant land; and
  • Redesigning the container yard and redirecting traffic flows through the terminal.

Bowe said terminal renovation at Global Gateway Central meets the city of Oakland’s goal of environmentally responsible growth. By improving efficiency, he said, truckers will be able to get in and out of the facility faster. That will reduce standby time and cut diesel emissions from idling big rigs.

A series of other air-quality improvement initiatives have been introduced at the Oakland terminal. They include the use of cleaner-burning low-sulfur diesel fuel on vessels in port, modernized container-handling equipment that generates fewer emissions and a new lighting system that reduces energy consumption by one-third.

The terminal is also studying a system known as cold-ironing. This enables ships at port to switch off diesel-burning auxiliary engines and eliminate emissions. Instead, they would connect to cleaner shoreside electrical power.

“The global economy is driving growth in containerized trade,” said Bowe. “We’re growing to meet the demand, but we’re doing it in a way that respects the environment and the communities around us.”

Global Gateway Central is one of four marine terminals operated by the company in the U.S. The others are located in Los Angeles, Seattle and Dutch Harbor, AK.

The terminals are central to APL’s pioneering strategy of transporting U.S. imports to the West Coast, then sending them to final destination via rail or highway. By dramatically increasing Oakland’s capacity, APL said it can offer shippers greater flexibility in selecting a West Coast gateway.

 

Media Inquiries:
Mike Zampa
Telephone: (1) 510 272 7380
michael_zampa@apl.com



Part of the NOL Group - link  to Web site